Bathroom renovation
From waterproofing to finished shower in four weeks.
Mölndal · Complete bathroom renovation · 4 weeks

Full strip-out, new floor drain and waterproofing to BBV with documentation. Graphite-grey large-format tiles, walk-in shower without threshold, black towel radiator and recessed spotlights.
The bathroom in Mölndal was on the lower ground floor and was worn, with old waterproofing, a floor drain that no longer met current requirements and a cramped shower. The client wanted a room that lasts for decades, not just one that looks new.
We stripped back to the shell, rebuilt the framing and installed a new floor drain. Floor and walls were waterproofed to the Swedish BBV industry rules with full documentation – the photo with the grey membrane and taped joints is from exactly that stage, before a single tile went up.
The room was then tiled with graphite-grey large-format stone-look tiles, with falls built in towards the drain so the shower zone works completely without a threshold. A black rain shower set, black towel radiator, recessed spotlights, a ribbed vanity unit with a bowl basin and a ribbed black door hold the detail line together. From strip-out to cleaned and finished, the project took four weeks.
Gallery



Contact
Planning something similar?
Book a free home visit and get a fixed-price quote within 24 hours – in English if you prefer.

