Kitchen renovation in Gothenburg by GTV Bygg AB

    Service · GTV Bygg AB · Gothenburg

    Kitchen renovation in Gothenburg – the heart of the home, built to last.

    From cramped space to natural gathering point. We plan, strip out and build new kitchens, coordinating carpentry, electrical, plumbing and tiling.

    The problem

    This is where it often goes wrong.

    Kitchen projects often stall between the kitchen supplier, electrician, plumber and tiler. The result: long waits and nobody taking overall responsibility.

    Our solution

    This is how we solve it.

    We coordinate every trade. You choose the kitchen – we handle everything in between, from strip-out to final inspection.

    What's included

    Full responsibility – nothing falls between the cracks.

    01

    Planning & 3D

    Function analysis, layout and visualisation of the new kitchen.

    02

    Strip-out & prep

    Removal, capping and preparation of walls, floors and ceiling.

    03

    Installations

    Relocating electrical, water, drainage and ventilation as needed.

    04

    Fitting & worktop

    Carcasses, fronts, worktop (stone, laminate or composite) and appliances.

    05

    Tiling & painting

    Splashback, tiles and painting for a seamless finish.

    Process

    How it works.

    01

    Home visit

    We measure the kitchen and discuss function and style.

    02

    Quote & sketch

    Fixed price, drawing and material proposal.

    03

    Ordering

    We order kitchen, appliances and materials on time.

    04

    Build & fit

    Strip-out, build and installation in one continuous run.

    05

    Final inspection

    Walk-through, adjustments and warranty documents.

    What makes the difference

    Why clients choose us.

    Clear schedule

    Deliveries planned so your kitchen is ready on the promised date.

    In-house tradespeople

    Carpenters, tilers and project manager in the same team.

    Fixed price

    No surprises when we open the walls.

    Questions & answers

    Common questions about kitchen renovation.

    A kitchen that lasts, brings the family together and lifts the whole home.

    How long will we be without a kitchen?
    Expect 4–6 weeks from strip-out to a working kitchen. We set up a temporary kitchen if needed.
    Can you help us choose a kitchen?
    Yes – we guide you through quality levels, suppliers and function based on budget.
    Can you move the kitchen within the layout?
    Yes, we adapt electrical, water and drainage to the new position.
    Is the ROT deduction available?
    Usually, for labour in your own home. Check current rules with Skatteverket.
    What warranty do you offer?
    5 years on workmanship as standard, plus manufacturer warranties on fittings and appliances.

    Contact

    Get a quote for kitchen renovation

    Book a free home visit today and get a clear, fixed-price quote within 24 hours. We're happy to work in English.

    Free quote

    Get a quote for kitchen renovation

    Or call us directly: +46 73 980 87 81
    Ring nu