
Service · GTV Bygg AB · Gothenburg
Remodeling in Gothenburg – adapt the home to your life, not the other way round.
We open up layouts, move walls, rebuild kitchens and bathrooms and adapt the home to today's needs – with full responsibility for structure and construction.
The problem
This is where it often goes wrong.
Many homes were designed for a life that no longer fits. Closed kitchens, small bathrooms, dark rooms – but removing walls without expertise is risky.
Our solution
This is how we solve it.
We do the structural calculations, secure load-bearing elements and rebuild the layout so the home works for your everyday life.
What's included
Full responsibility – nothing falls between the cracks.
Structural check
A structural engineer calculates load-bearing walls and beams.
Demolition & shoring
Careful demolition with temporary supports.
Steel beams & frame
Steel beams and new load-bearing elements where walls are removed.
Installations
Electrical, plumbing and ventilation adapted to the new layout.
Surfaces & finish
New floors, walls, ceilings and joinery that tie the rooms together.
Process
How it works.
Home visit
We review the layout and your ideas.
Engineering
The engineer calculates loads and produces structural drawings.
Quote
Fixed price based on the calculated work.
Construction
Demolition, shoring, new frame and installations.
Finish
Surfaces, joinery and final inspection.
What makes the difference
Why clients choose us.
Engineer in our network
A Gothenburg-based structural engineer who can come quickly.
Housing-association experience
We know how Gothenburg's BRF boards want remodels handled.
Fixed price
We don't open walls without knowing what it costs.
Previous projects
Examples of remodeling work we've delivered.
We do remodeling work in
Gothenburg and surroundings.
Questions & answers
Common questions about remodeling & layout changes.
A home that opens up – more light, more flow, more room for life.
- Can I remove any wall?
- No. Load-bearing walls require structural calculations and a replacement beam.
- Do I need a permit?
- Not always for interior work, but in a condominium (bostadsrätt) the association's approval is required.
- How long does it take?
- A typical layout change takes 4–8 weeks.
- What does it cost?
- From roughly SEK 120,000 for a simple opening. Fixed price after a visit.
- Do you handle the housing association's approval?
- Yes, we prepare the documents and answer the board's questions.
Contact
Get a quote for remodeling & layout changes
Book a free home visit today and get a clear, fixed-price quote within 24 hours. We're happy to work in English.


