Remodeling & layout changes in Gothenburg by GTV Bygg AB

    Service · GTV Bygg AB · Gothenburg

    Remodeling in Gothenburg – adapt the home to your life, not the other way round.

    We open up layouts, move walls, rebuild kitchens and bathrooms and adapt the home to today's needs – with full responsibility for structure and construction.

    The problem

    This is where it often goes wrong.

    Many homes were designed for a life that no longer fits. Closed kitchens, small bathrooms, dark rooms – but removing walls without expertise is risky.

    Our solution

    This is how we solve it.

    We do the structural calculations, secure load-bearing elements and rebuild the layout so the home works for your everyday life.

    What's included

    Full responsibility – nothing falls between the cracks.

    01

    Structural check

    A structural engineer calculates load-bearing walls and beams.

    02

    Demolition & shoring

    Careful demolition with temporary supports.

    03

    Steel beams & frame

    Steel beams and new load-bearing elements where walls are removed.

    04

    Installations

    Electrical, plumbing and ventilation adapted to the new layout.

    05

    Surfaces & finish

    New floors, walls, ceilings and joinery that tie the rooms together.

    Process

    How it works.

    01

    Home visit

    We review the layout and your ideas.

    02

    Engineering

    The engineer calculates loads and produces structural drawings.

    03

    Quote

    Fixed price based on the calculated work.

    04

    Construction

    Demolition, shoring, new frame and installations.

    05

    Finish

    Surfaces, joinery and final inspection.

    What makes the difference

    Why clients choose us.

    Engineer in our network

    A Gothenburg-based structural engineer who can come quickly.

    Housing-association experience

    We know how Gothenburg's BRF boards want remodels handled.

    Fixed price

    We don't open walls without knowing what it costs.

    Questions & answers

    Common questions about remodeling & layout changes.

    A home that opens up – more light, more flow, more room for life.

    Can I remove any wall?
    No. Load-bearing walls require structural calculations and a replacement beam.
    Do I need a permit?
    Not always for interior work, but in a condominium (bostadsrätt) the association's approval is required.
    How long does it take?
    A typical layout change takes 4–8 weeks.
    What does it cost?
    From roughly SEK 120,000 for a simple opening. Fixed price after a visit.
    Do you handle the housing association's approval?
    Yes, we prepare the documents and answer the board's questions.

    Contact

    Get a quote for remodeling & layout changes

    Book a free home visit today and get a clear, fixed-price quote within 24 hours. We're happy to work in English.

    Free quote

    Get a quote for remodeling & layout changes

    Or call us directly: +46 73 980 87 81
    Ring nu